CPS2 Multi Key Writing QSB

Installation instructions:

  1. insert the protruding pins of the 2×6 header into the top of the hole pattern for J4 on the Multi kit and solder the header pins in place from the bottom side of the multi kit. Make sure the QSB board is flush with the multi kit pcb.
  2. Add solder into the 2 holes on the right side of the QSB making a connection to the pads for SWD6 and SWD7.
  3. Attach the QSB to CN9 on the B board using the provided 6 pin JST NH terminated cable. For B boards without CN9 you just solder the wires to CN2 using the provided cable, just like a normal key writing install.

CN2 Pinout:
DATA: JST NH PIN #5→ CN2 A32
SETUP: JST NH PIN #4→ CN2 A30
CLOCK: JST NH PIN #3→ CN2 A31
SETUP2: JST NH PIN #2→ CN2 A29

 

Overview and Installation Video

Arcade Projects Thread

This project was originally posted on the Arcade Projects forum. You can check that thread out if you like.